Instructions / Assembly
Table Of Contents
- Part 1 - General Safety Information
 - Part 2 - Before You Start
 - Part 3 - Prepare the Boiler
- A. Locating the Boiler
 - B. Structure
 - C. Leveling
 - D. Clearances for Service Access
 - E. Wall Mounting Considerations
 - F. Wall Mounting Instructions
 - G. Residential Garage and Closet Installations
 - H. Exhaust Vent and Intake Pipe
 - I. Carbon Monoxide Detectors
 - J. Prevent Combustion Air Contamination
 - K. Removing a Boiler from a Common Vent System
 - K. Water Chemistry Requirements*
 - L. Technical Specifications
 
 - Part 4 - Piping
- A. General Plumbing Information
 - B. Relief Valve
 - C. Backflow Preventer
 - D. Potable Expansion Tank
 - E. Circulators
 - F. Hydronic Piping with Circulators, Zone Valves, and Multiple Boilers
 - G. Circulator Sizing
 - H. Check / Control Water Chemistry
 - I. Plumbing
 - J. Fill and Purge Heating System
 - K. Glycol Antifreeze Solutions
 - L. Zoning with Zone Valves
 - M. Zoning with Circulators
 - N. Multiple Boilers
 - O. Applications*
 
 - Part 5 - Venting
 - Part 6 - Condensate Removal
 - Part 7 - Wiring
- A. Installation Must Comply With
 - B. Field Wiring Terminations
 - C. Field Wiring
 - D. Line Voltage Wiring for Standard Boiler
 - E. Alarm Connections
 - F. Low Voltage Connections for Standard Boiler
 - G. Thermostat
 - H. Outdoor Sensor
 - I. Indirect Sensor
 - J. Optional 0-10 Volt Building Control Signal
 - K. Optional UL353 Low Water Cut-Off Interface Kit
 - L. Wiring of Cascade System Communication Bus
 - M. Cascade Master Pump and Sensor Wiring
 - N. Cascade Follower Pump and Sensor Wiring
 
 - Part 8 - Gas Connections
 - Part 9 - Start-Up Preparation
- A. Check / Control Water Chemistry
 - B. Check for Gas Leaks
 - C. Freeze Protection (When Used)
 - D. Fill and Test Water System
 - E. Purge Air from Water System
 - F. Check Thermostat Circuit(s)
 - G. Condensate Removal
 - H. Final Checks Before Starting Boiler
 - I. Setting Up a Single Boiler
 - J. Setting Up a Cascaded System
 - K. Lockout Condition
 - L. Cascade System Programming
 
 - Part 10 - Start-Up Procedure
 - Part 11 - Start-Up Procedures for the Installer
 - Part 12 - Troubleshooting
 - Part 13 - Maintenance
 - Part 14 - Shutdown
 - Part 15 - Installation Checklist
 - Part 16 - Maintenance Report
 - Part 17 - Replacement Parts
 

LP-387 Rev. 011 Rel. 006 Date 6.28.19
36
DO NOT INSTALL
WATER HEATER, 
BOILER, OR 
APPLIANCE
NEAR DRYER
LP-325-X
Figure 22 - Do Not Place Appliance Near Dryer
ROOM OPENING
ROOM OPENING
6"
6"
EXHAUST 
LP-325-S
09/29/11
Boiler,
Water Heater,
or Appliance
Indoor Combustion Air
(Single Pipe)
EXHAUST
UPPER
AIR DUCT
LOWER
AIR DUCT
LP-325-T
8/5/2010
Boiler,
Water Heater,
or Appliance
Outdoor Combustion Air
(Single Pipe)
Figure 23 - Indoor and Outdoor Combustion Air - Single Pipe










