Instructions / Assembly
Table Of Contents
- Part 1 - General Safety Information
- Part 2 - Before You Start
- Part 3 - Prepare the Boiler
- A. Locating the Boiler
- B. Structure
- C. Leveling
- D. Clearances for Service Access
- E. Wall Mounting Considerations
- F. Wall Mounting Instructions
- G. Residential Garage and Closet Installations
- H. Exhaust Vent and Intake Pipe
- I. Carbon Monoxide Detectors
- J. Prevent Combustion Air Contamination
- K. Removing a Boiler from a Common Vent System
- K. Water Chemistry Requirements*
- L. Technical Specifications
- Part 4 - Piping
- A. General Plumbing Information
- B. Relief Valve
- C. Backflow Preventer
- D. Potable Expansion Tank
- E. Circulators
- F. Hydronic Piping with Circulators, Zone Valves, and Multiple Boilers
- G. Circulator Sizing
- H. Check / Control Water Chemistry
- I. Plumbing
- J. Fill and Purge Heating System
- K. Glycol Antifreeze Solutions
- L. Zoning with Zone Valves
- M. Zoning with Circulators
- N. Multiple Boilers
- O. Applications*
- Part 5 - Venting
- Part 6 - Condensate Removal
- Part 7 - Wiring
- A. Installation Must Comply With
- B. Field Wiring Terminations
- C. Field Wiring
- D. Line Voltage Wiring for Standard Boiler
- E. Alarm Connections
- F. Low Voltage Connections for Standard Boiler
- G. Thermostat
- H. Outdoor Sensor
- I. Indirect Sensor
- J. Optional 0-10 Volt Building Control Signal
- K. Optional UL353 Low Water Cut-Off Interface Kit
- L. Wiring of Cascade System Communication Bus
- M. Cascade Master Pump and Sensor Wiring
- N. Cascade Follower Pump and Sensor Wiring
- Part 8 - Gas Connections
- Part 9 - Start-Up Preparation
- A. Check / Control Water Chemistry
- B. Check for Gas Leaks
- C. Freeze Protection (When Used)
- D. Fill and Test Water System
- E. Purge Air from Water System
- F. Check Thermostat Circuit(s)
- G. Condensate Removal
- H. Final Checks Before Starting Boiler
- I. Setting Up a Single Boiler
- J. Setting Up a Cascaded System
- K. Lockout Condition
- L. Cascade System Programming
- Part 10 - Start-Up Procedure
- Part 11 - Start-Up Procedures for the Installer
- Part 12 - Troubleshooting
- Part 13 - Maintenance
- Part 14 - Shutdown
- Part 15 - Installation Checklist
- Part 16 - Maintenance Report
- Part 17 - Replacement Parts











