Installation Instructions
Table Of Contents
- About This Document
- Contents
- 1 Changes in AAU3940 Installation Guide
- 2 Overview
- 3 Installation Preparations
- 4 Unpacking Check
- 5 Installation Process
- 6 (Optional) Installing an ODM
- 7 Preprocessing the AAU Maintenance Cavity
- 8 Lifting an AAU
- 9 Installing an AAU
- 10 Installing AAU Cables
- 11 Closing a Maintenance Cavity
- 12 (Optional) Installing a Cord Cover for an ODM
- 13 Adjusting the Horizontal Azimuth of an Antenna
- 14 Installation Checklist
- 15 Powering on an AAU
- 16 Appendix
Figure 16-2 two-hole OT terminal and materials related to a power cable
A heat shrink tubing B. two-hole OT terminal
with a bare crimping
terminal
C. Insulation layer of a power
cable
D. Conductor of a power
cable
Procedure
Step 1 Based on the cross-sectional area of the cable conductor, strip a part of the insulation layer. The
L1-long conductor is exposed, as shown in Figure 16-3. The recommended values of L1 are
listed in Table 16-1.
Figure 16-3 Stripping a power cable (OT terminal)
AAU3940
Installation Guide
16 Appendix
Issue 01 (2015-01-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
99