Installation Instructions
Table Of Contents
- About This Document
- Contents
- 1 Changes in AAU3940 Installation Guide
- 2 Overview
- 3 Installation Preparations
- 4 Unpacking Check
- 5 Installation Process
- 6 (Optional) Installing an ODM
- 7 Preprocessing the AAU Maintenance Cavity
- 8 Lifting an AAU
- 9 Installing an AAU
- 10 Installing AAU Cables
- 11 Closing a Maintenance Cavity
- 12 (Optional) Installing a Cord Cover for an ODM
- 13 Adjusting the Horizontal Azimuth of an Antenna
- 14 Installation Checklist
- 15 Powering on an AAU
- 16 Appendix
NOTICE
When you heat the heat shrink tubing, do not heat it with too much time.
----End
16.2 Adding a Tool-Less Female Connector (Pressfit Type)
to an AAU Power Cable on the AAU Side
This section describes the procedure for adding a tool-less female connector (pressfit type) to
an AAU power cable on the AAU side.
Context
The following figure shows the cable diagram on the label for an AAU power cable.
Figure 16-7 Cable diagram on the label for an AAU power cable
Procedure
Step 1 Determine the length of the power cable for different operations based on the cable diagram on
the label for a power cable, as shown in the following figure.
Figure 16-8 Determining the length of a power cable
AAU3940
Installation Guide 16 Appendix
Issue 01 (2015-01-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
102