Installation Instructions
Table Of Contents
- About This Document
- Contents
- 1 Changes in AAU3940 Installation Guide
- 2 Overview
- 3 Installation Preparations
- 4 Unpacking Check
- 5 Installation Process
- 6 (Optional) Installing an ODM
- 7 Preprocessing the AAU Maintenance Cavity
- 8 Lifting an AAU
- 9 Installing an AAU
- 10 Installing AAU Cables
- 11 Closing a Maintenance Cavity
- 12 (Optional) Installing a Cord Cover for an ODM
- 13 Adjusting the Horizontal Azimuth of an Antenna
- 14 Installation Checklist
- 15 Powering on an AAU
- 16 Appendix
The method of connecting a flange plate to the top of a pole is determined by customers. The
following figure shows the design specifications of ports on a flange plate for connecting an
AAU.
Figure 2-4 Design specifications of ports on a flange plate
(1) Flange plate (2) Screw hole (3) Nut
2.2 Installation Clearance Requirements
This section describes installation clearance requirements in different scenarios.
The following figure shows the clearance requirements for installing an AAU.
NOTE
The following figure shows the clearance requirements for independently installing an AAU. When an AAU is
installed together with an ODM, the clearance requirements are different.
AAU3940
Installation Guide 2 Overview
Issue 01 (2015-01-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.