Installation Instructions
Table Of Contents
- About This Document
- Contents
- 1 Changes in AAU3940 Installation Guide
- 2 Overview
- 3 Installation Preparations
- 4 Unpacking Check
- 5 Installation Process
- 6 (Optional) Installing an ODM
- 7 Preprocessing the AAU Maintenance Cavity
- 8 Lifting an AAU
- 9 Installing an AAU
- 10 Installing AAU Cables
- 11 Closing a Maintenance Cavity
- 12 (Optional) Installing a Cord Cover for an ODM
- 13 Adjusting the Horizontal Azimuth of an Antenna
- 14 Installation Checklist
- 15 Powering on an AAU
- 16 Appendix
Level Torque screwdriver Torque socket
Multimeter
Marker (diameter ≤ 10 mm
or 0.39 in.)
Measuring tape
Hex key Fixed pulley Lifting sling
Hydraulic pliers Fiber fusion splicer Geologic compass
Hammer drill
3.3 Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
The customer must pay attention to the following points before the installation:
l The customer's technical engineers must be trained by Huawei and be familiar with the
installation and operation methods.