l The number of onsite personnel depends on the engineering schedule and installation
environment. Generally, four to five onsite personnel are necessary.
AAU3940
Installation Guide 3 Installation Preparations
Issue 01 (2015-01-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
20