Installation Instructions
Table Of Contents
- About This Document
- Contents
- 1 Changes in AAU3940 Installation Guide
- 2 Overview
- 3 Installation Preparations
- 4 Unpacking Check
- 5 Installation Process
- 6 (Optional) Installing an ODM
- 7 Preprocessing the AAU Maintenance Cavity
- 8 Lifting an AAU
- 9 Installing an AAU
- 10 Installing AAU Cables
- 11 Closing a Maintenance Cavity
- 12 (Optional) Installing a Cord Cover for an ODM
- 13 Adjusting the Horizontal Azimuth of an Antenna
- 14 Installation Checklist
- 15 Powering on an AAU
- 16 Appendix
Figure 10-11 Installing a PGND cable when an AAU is installed on the top of a pole
NOTE
When installing a PGND cable, tightly press the OT terminal in the correct direction, as shown in
the following figure.
Figure 10-12 Installing an OT terminal correctly
2. Connect the other end of the PGND cable with an M8 OT terminal to the external ground
bar.
Step 3 Optional: When two or three AAUs are installed on a pole, equipotential cable(s) are required.
The following figure shows the method of installing equipotential cables between AAUs.
AAU3940
Installation Guide
10 Installing AAU Cables
Issue 01 (2015-01-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
66