Installation Instructions

Figure 10-33 Reserving slack of a CPRI fiber optic cable
a: Scenario in which a pole is used
(routing a cable along the inner
side of the pole)
b: Scenario in which a pole is used
(routing a cable along the outer
side of the pole)
c: Scenario in which a wall is used
l Lay out the cables according to the instructions in Cabling Requirements, and use cable
ties to bind them.
l Label the installed cables according to the instructions in Attaching an L-Shaped Label.
----End
Follow-up Procedure
After all cables for the ODM are installed, close the ODM case and tighten the M4 screw on the
cover.
AAU3940
Installation Guide
10 Installing AAU Cables
Issue 01 (2015-01-15) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
85