User's Manual

Table Of Contents
Figure 2-3 Installation flowchart of the AP5030DN and AP5130DN
Connect the cable
Start
Check before installation
Install the AP
Determine the
installation location
Connect the security lock
t
o the lock hole
Power on the AP
Check after installation
End
Fix the wall-mounting
b
racket to a T-rail
Fix the wall-mounting
b
racket against the wall
Fix the wall-mounting
b
racket against the ceiling
To a T-rail
Against the ceiling
Against the wall
2.3 Unpacking the Equipment
Before
unpacking the carton, ensure that the packing carton is intact and not damaged or soaked.
Stop unpacking if the equipment is rusted or soggy. Then, investigate causes and contact the
supplier.
After unpacking, check items in the carton against the packing list. If any item is missing, contact
the supplier or agent.
Usually, the packing carton contains all items listed in the packing list shown in Table 2-1.
Table 2-1 Packing list
No. Item Quantity Unit
1 AP device 1 PCS
2 Power adapter
(optional)
1 PCS
Huawei Indoor Access Points
Hardware Installation and Maintenance Guide 2 AP Installation
Issue 08 (2014-04-10) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14