User's Manual
Table Of Contents
- About This Document
- Contents
- 1 Indoor AP Overview
- 2 AP Installation
- 3 Logging In to the AP
- 4 Hardware Failures
- 5 Appendix
Figure 5-77 Mold installed in the COAX crimping tools
Figure 5-78 shows the mold installed in the COAX crimping tool.
Figure 5-78 An installed mold
----End
5.2 Environmental Requirements for Device Operation
5.2.1 Environmental Requirements for an Equipment Room
Requirements for Selecting a Site for an Equipment Room
When designing a project, consider the communication network planning and technical
requirements
of the equipment. Also consider hydrographic, geological, seismic, power supply,
and transportation factors.
Construction, structure, heating and ventilation, power supply, lighting and fire fighting of the
equipment room should be designed by specialized construction designers to suit the
environmental requirements of devices. The equipment room should also follow local
regulations concerning the industrial construction, environmental protection, fire fighting, and
Huawei Indoor Access Points
Hardware Installation and Maintenance Guide 5 Appendix
Issue 08 (2014-04-10) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
79