User's Manual

Table Of Contents
Figure 2-1 Installation flowchart
2.3 Unpacking the Equipment
Before unpacking the carton, ensure that the packing carton is intact and not damaged or
soaked. Stop unpacking if the equipment is rusted or soggy. Then, investigate causes and
contact the supplier.
After unpacking, check items in the carton against the packing list. If any item is missing,
contact the supplier or agent.
Usually, the packing list contains the following items.
l AP device
l Antennas
l Sheet metal mounting bracket
l OT terminal
l Adjustable buckle
l Expansion screws
l Quick start guide
l Warranty card
l MAC address label
l SN label
AP6050DN & AP6150DN
Hardware Installation and Maintenance Guide
2 AP Installation
Issue 03 (2016-09-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10