6 Hoisting the RRU and Cables onto a Tower
Issue 05 (2017-03-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
33
Figure 6-9 Hoisting power cables onto the tower
1. Lifting sling
2. Fixed pulley
1. Technician A climbs the tower, secures a fixed pulley to the support on the tower
platform, and then routes the lifting sling through the fixed pulley.
2. Installation engineer B secures three cable ties to the power cable connector, and then
secures the power cable to the lifting sling, as shown in Figure 6-10.
The connector on the power cable in the figure is only an example. The actual connector may vary
according to the situation.