User's Manual

RRU3278
Installation Guide
6 Hoisting the RRU and Cables onto a Tower
Issue 05 (2017-03-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
34
Figure 6-10 Binding cable ties
3. Technician B wraps the power cable connector with a layer of PVC insulation tape, as
shown in Figure 6-11.
Wrap the PVC insulation tape from 30 mm (1.18 in.) away from one end of the connector until it reaches
the other end of the connector. The total length of the wrapped connector is 100 mm (3.94 in.).