User's Manual
RRU3278
Installation Guide
6 Hoisting the RRU and Cables onto a Tower
Issue 05 (2017-03-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
35
Figure 6-11 Wrapping the PVC insulation tape
4. Technician C pulls the lifting sling downwards, and technician B pulls the traction sling
outwards to protect the power cables from colliding with the tower.
Step 2 Secure the power cables to the tower vertically using cable clips.
Step 3 Remove the lifting sling and traction sling.
The previous hoisting procedure is for reference only.
----End