User's Manual
RRU3278
Installation Guide
8 Installing RRU Cables
Issue 05 (2017-03-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
71
Figure 8-15 Installing an RRU RF jumper
On AC-powered electric railways, such as high-speed railways, when leaky cables are
connected to RRUs installed in tunnels, high-voltage-resistance DC blocks must be installed
between RRU RF jumpers and the leaky cables to protect the RRUs against damage.
Step 3 Waterproof the ANT ports on the RRU, as shown in Figure 8-16.