User's Manual

Table Of Contents
SmartLogger3000
User Manual
6 WebUI Operations
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
121
To ensure that the SmartLogger will deliver scheduling commands to the connected solar
inverters, you must select the active or reactive power control mode before adjusting the
active or reactive power for a PV plant.
If Active power control mode is set to No limit or Reactive power control mode is set
to No output, the SmartLogger does not send scheduling commands to the connected solar
inverters.
6.4.2 Setting Active Power Control
If the PV plant has requirements of power limitation, the power grid scheduling personnel
should limit the active power or disable all the active power for the PV plant, that is, to enable
the active power derating mode.
Step 1 Choose Monitoring > SUN2000 > Running Param. > Power Adjustment. On the displayed
page, check that Remote power schedule is set to Enable.
Step 2 Set the parameters for active power control and click Submit.
Figure 6-42 Active power control
----End
No Limit
Parameter
Description
Active power control
mode
Set this parameter to No limit for the solar inverter to run at
full load.
DI Active Scheduling