User's Manual
Table Of Contents
- About This Document
- Contents
- 1 Safety Information
- 2 Product Overview
- 3 Device Installation
- 4 Cable Connections
- 4.1 Connecting Cables to the SmartLogger
- 4.1.1 Preparing Cables
- 4.1.2 Connecting a PE Cable
- 4.1.3 Connecting an RS485 Communications Cable
- 4.1.4 Connecting an MBUS Cable
- 4.1.5 Connecting a DI Signal Cable
- 4.1.6 Connecting the Output Power Cable
- 4.1.7 Connecting the AI Signal Cable
- 4.1.8 Connecting the DO Signal Cable
- 4.1.9 Connecting the Ethernet Cable
- 4.1.10 Connecting Fiber Jumpers
- 4.1.11 Installing a SIM Card and a 4G Antenna
- 4.1.12 Connecting the 24 V Input Power Cable
- 4.2 Connecting Cables to the SmartModule
- 4.2.1 Preparing Cables
- 4.2.2 Connecting the PE Cable
- 4.2.3 Connecting the Ethernet Cable
- 4.2.4 Connecting the 12 V Power Input Cable
- 4.2.5 Connecting the RS485 Communications Cable
- 4.2.6 Connecting the DI Signal Cable
- 4.2.7 Connecting the Output Power Cable
- 4.2.8 Connecting the AI Signal Cable
- 4.2.9 Connecting the PT Signal Cable
- 4.2.10 Connecting the 24 V Power Input Cable
- 4.1 Connecting Cables to the SmartLogger
- 5 System Operation
- 6 WebUI Operations
- 6.1 Introduction to WebUI
- 6.2 Device Commissioning
- 6.3 Parameter Settings
- 6.3.1 Setting User Parameters
- 6.3.2 Setting Parameters for Connecting to the Management System
- 6.3.3 Setting RS485 Communications Parameters
- 6.3.4 Setting Parameters for the Slave SmartLogger
- 6.3.5 Setting MBUS Parameters
- 6.3.6 Setting SUN2000 Parameters
- 6.3.7 Setting PID Module Parameters
- 6.3.8 Setting Power Meter Parameters
- 6.3.9 Setting EMI Parameters
- 6.3.10 Setting STS Parameters
- 6.3.11 Setting IEC103 Device Parameters
- 6.3.12 Setting Parameters for a Custom Device
- 6.3.13 Setting IEC104 Device Parameters
- 6.4 Power Grid Scheduling
- 7 Device Maintenance
- 8 FAQ
- 8.1 How Do I Connect the SmartLogger to the SUN2000 App or FusionSolar App?
- 8.2 How Do I Set FTP Parameters?
- 8.3 How Do I Set Email Parameters?
- 8.4 How Do I Change the SSID and Password of the Built-in WLAN?
- 8.5 How Do I Use DI Ports?
- 8.6 How Do I Use DO Ports?
- 8.7 How Do I Use the USB Port?
- 8.8 How Do I Change a Device Name?
- 8.9 How Do I Change the Communications Address?
- 8.10 How Do I Export Inverter Parameters?
- 8.11 How Do I Clear Alarms?
- 8.12 How Do I Enable the AI1 Port to Detect SPD Alarms?
- 8.13 Which Models of Power Meters and EMIs Are Supported by the SmartLogger?
- 8.14 How Do I Check the SIM Card Status?
- 9 Technical Specifications
- A Product User Lists
- B Domain Name List of Management Systems
- C Acronyms and Abbreviations
SmartLogger3000
User Manual
6 WebUI Operations
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
123
Remote Communication Scheduling
The management system or independent power adjustment device sends scheduling
commands over the communications port that works with Modbus-TCP or IEC104, without
the need of user configuration or operation. The SmartLogger can automatically switch
between scheduling modes and send scheduling commands.
Parameter
Description
Active power control
mode
Set this parameter to Remote communication scheduling.
The SmartLogger parses the scheduling command delivered
by the upper-layer management system to valid instruction
data that can be identified by the solar inverters in the PV
plant and delivers the data to all solar inverters connected to
the SmartLogger.
As the Remote communication scheduling mode has a
higher priority, the SmartLogger automatically changes
Active power control mode to Remote communication
scheduling after receiving a scheduling command from the
upper-layer management system.
Schedule strategy
The value can be Disable, Strategy 1, or Strategy 2.
Disable: The SmartLogger controls the solar inverter to
work at full load and will not receive scheduling
commands sent by the management system.
Strategy 1: Open-loop scheduling policy. That is, the
SmartLogger evenly allocates the power value from the
scheduling and delivers the average value to each solar
inverter, which then operates with the specific power. The
adjustment value delivered by the SmartLogger is
constant. If Adjustment coefficient is set, the power value
will be sent to the solar inverter after being multiplied by
the preset coefficient.
Strategy 2: The customized function is provided for a
specific power plant. Set Overshoot, Adjustment period,
and Adjustment deadband based on the scheduling
requirements of the power plant.
Grid connection with limited power (kW)