User's Manual

Table Of Contents
SmartLogger3000
User Manual
6 WebUI Operations
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
125
Parameter
Description
Switch-off state feedback
port
Set this parameter to the DI port that reports the switch-off
status.
Switch-on state feedback
port
Set this parameter to the DI port that reports the switch-on
status.
Step 2 Verify that the SmartLogger can remotely turn on and off circuit breakers in scenarios with
circuit breakers.
Click Switch off and check that the circuit breaker is switched off properly.
Click Switch on and check that the circuit breaker is switched on properly.
----End
Remote Output Control
Step 1 Synchronize the clock source of the server.
Path
Parameter
Description
Settings > User
Param. >
Date&Time
Clock source
Set this parameter to NTP.
Server
Set this parameter to the IP address or domain
name of the server for time synchronization.
NTP
synchronization
test
You can click this button to check the time
synchronization status.
Step 2 Set remote output control parameters.
Path
Parameter
Description
Settings > Active
Power Control
Active power
control mode
Set this parameter to Remote output control.
Control area
Set this parameter to the area where the
remote output control function is used. To
enable the function in some areas, the license
needs to be imported and enabled.
Output control
duration
Set this parameter to the time required for the
solar inverter to change its output power from
0% to 100% or from 100% to 0%.
PV plant ID
Set this parameter to the PV plant ID.
Remote output
control server
Set this parameter to the IP address or domain
name of the server.