Path
Parameter
Description
Enable certificate
Determine whether to import and enable a
certificate based on the actual situation.
PV module
capacity
Set this parameter to the capacity of PV
modules connected to the PV plant.
Plant AC capacity
Set this parameter to the AC capacity of the
restricted power that is fed into the power grid
from the PV plant.
If the connection between the SmartLogger and the server is abnormal, obtain the output control file
in .data format from the website of the power company and import the file.
After the SmartLogger connects to the server, you can export the relevant file.
----End
6.4.3 Setting Reactive Power Control
Large-scale PV plants are required to adjust the voltage at the grid-tied point. Power grid
scheduling personnel enable a PV plant to absorb or add reactive power at the grid-tied point,
that is, to enable the reactive power compensation, based on the real-time reactive power
transmission status in the power grid.
Step 1 Choose Monitoring > SUN2000 > Running Param. > Power Adjustment. On the displayed
page, check that Remote power schedule is set to Enable.
Step 2 Set the parameters for reactive power control and click Submit.
Figure 6-43 Reactive power control
----End