Figure 6-47 Setting parameters for smart reactive power compensation
When the SmartLogger receives a remote reactive power scheduling command from the PV
plant, it automatically changes Reactive power control mode to Remote communication
scheduling. If power factor closed-loop control is required, set Reactive power control
mode to Power factor closed-loop control and set the target power factor correctly.
----End
6.4.6 Setting DRM Parameters
Context
According to an Australian standard, the inverters must comply with demand response modes
(DRM).
Figure 6-48 Wiring diagram for the DRM function