7.3 Alarm List
Alarm
ID
Alarm
Name
Alarm
Severity
Alarm
Sub-ID
Cause
Suggestions
1100
Active
Power
Scheduli
ng
Instructi
on
Exceptio
n
Major
4
In Dry contact
remote control
mode of the
active power,
the four DI
ports read
command
combinations
that are not
configured.
1. Check that the cables are connected
correctly to the DI ports.
2. Access the Dry contact remote control
configuration page of the active power
and check the mapping table of the DI
signal configuration.
3. Contact the power grid company to
check that the configurations in the
mapping table are complete and meet
the requirements.
1101
Reactive
Power
Scheduli
ng
Instructi
on
Exceptio
n
Major
4
In Dry contact
remote control
mode of the
reactive power,
the four DI
ports read
command
combinations
that are not
configured.
1. Check that the cables are connected
correctly to the DI ports.
2. Access the Dry contact remote control
configuration page of the reactive power
and check the mapping table of the DI
signal configuration.
3. Contact the power grid company to
check that the configurations in the
mapping table are complete and meet
the requirements.
1103
General
Circuit
Breaker
Disconn
ected
Major
1
The general
circuit breaker
at the grid
connection
point is
disconnected.
Check whether the disconnection is a
normal. If it is abnormal, contact service
engineers to reconnect the circuit breaker.
1104
Abnorm
al
Cubicle
Major
1
The Cubicle
device has
detected an
exception at the
grid connection
point.
When the Cubicle alarm is enabled, check
whether the DI signal received by the
SmartLogger is consistent with the dry
contact status. If yes, restart the solar
inverter.