User's Manual
Table Of Contents
- About This Document
- Contents
- 1 Safety Information
- 2 Product Overview
- 3 Device Installation
- 4 Cable Connections
- 4.1 Connecting Cables to the SmartLogger
- 4.1.1 Preparing Cables
- 4.1.2 Connecting a PE Cable
- 4.1.3 Connecting an RS485 Communications Cable
- 4.1.4 Connecting an MBUS Cable
- 4.1.5 Connecting a DI Signal Cable
- 4.1.6 Connecting the Output Power Cable
- 4.1.7 Connecting the AI Signal Cable
- 4.1.8 Connecting the DO Signal Cable
- 4.1.9 Connecting the Ethernet Cable
- 4.1.10 Connecting Fiber Jumpers
- 4.1.11 Installing a SIM Card and a 4G Antenna
- 4.1.12 Connecting the 24 V Input Power Cable
- 4.2 Connecting Cables to the SmartModule
- 4.2.1 Preparing Cables
- 4.2.2 Connecting the PE Cable
- 4.2.3 Connecting the Ethernet Cable
- 4.2.4 Connecting the 12 V Power Input Cable
- 4.2.5 Connecting the RS485 Communications Cable
- 4.2.6 Connecting the DI Signal Cable
- 4.2.7 Connecting the Output Power Cable
- 4.2.8 Connecting the AI Signal Cable
- 4.2.9 Connecting the PT Signal Cable
- 4.2.10 Connecting the 24 V Power Input Cable
- 4.1 Connecting Cables to the SmartLogger
- 5 System Operation
- 6 WebUI Operations
- 6.1 Introduction to WebUI
- 6.2 Device Commissioning
- 6.3 Parameter Settings
- 6.3.1 Setting User Parameters
- 6.3.2 Setting Parameters for Connecting to the Management System
- 6.3.3 Setting RS485 Communications Parameters
- 6.3.4 Setting Parameters for the Slave SmartLogger
- 6.3.5 Setting MBUS Parameters
- 6.3.6 Setting SUN2000 Parameters
- 6.3.7 Setting PID Module Parameters
- 6.3.8 Setting Power Meter Parameters
- 6.3.9 Setting EMI Parameters
- 6.3.10 Setting STS Parameters
- 6.3.11 Setting IEC103 Device Parameters
- 6.3.12 Setting Parameters for a Custom Device
- 6.3.13 Setting IEC104 Device Parameters
- 6.4 Power Grid Scheduling
- 7 Device Maintenance
- 8 FAQ
- 8.1 How Do I Connect the SmartLogger to the SUN2000 App or FusionSolar App?
- 8.2 How Do I Set FTP Parameters?
- 8.3 How Do I Set Email Parameters?
- 8.4 How Do I Change the SSID and Password of the Built-in WLAN?
- 8.5 How Do I Use DI Ports?
- 8.6 How Do I Use DO Ports?
- 8.7 How Do I Use the USB Port?
- 8.8 How Do I Change a Device Name?
- 8.9 How Do I Change the Communications Address?
- 8.10 How Do I Export Inverter Parameters?
- 8.11 How Do I Clear Alarms?
- 8.12 How Do I Enable the AI1 Port to Detect SPD Alarms?
- 8.13 Which Models of Power Meters and EMIs Are Supported by the SmartLogger?
- 8.14 How Do I Check the SIM Card Status?
- 9 Technical Specifications
- A Product User Lists
- B Domain Name List of Management Systems
- C Acronyms and Abbreviations
SmartLogger3000
User Manual
8 FAQ
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
157
Figure 8-2 Logging in to the app
----End
8.2 How Do I Set FTP Parameters?
Context
The FTP function is used to access a third-party NMS. The SmartLogger can report the
configuration information and running data of the managed PV plant system through FTP. A
third-party NMS can access Huawei devices after being configured.
FTP is a universal standard protocol without any security authentication mechanism. Data
transmitted by FTP is not encrypted. To reduce network security risks, the IP address of the
connected third-party FTP server is left blank by default. This protocol can transmit the
running data of PV plants, which may cause user data breach. Therefore, exercise caution
when using this protocol. Users are liable for any loss caused by the enabling of the FTP
protocol (non-secure protocol). Users are advised to take measures at the PV plant level to
reduce security risks, or use Huawei management system to mitigate the risks.
Procedure
Step 1 Set FTP parameters and click Submit.










