User's Manual

Table Of Contents
SmartLogger3000
User Manual
4 Cable Connections
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
48
Figure 4-11 Connecting fiber jumpers
----End
Follow-up Procedure
Disconnection can be performed in reverse order.
When removing an optical fiber, press the latch first.
When removing an optical module, pull it out by the handle. Ensure that the interval between
removing and inserting an optical module is greater than 0.2s.
4.1.11 Installing a SIM Card and a 4G Antenna
Context
The SmartLogger provides the 4G wireless communication function. A SIM card of the local
carrier can be inserted for dial-up access.
Prepare a standard SIM card (dimensions: 25 mm x 15 mm; capacity ≥ 64 KB). Monthly
traffic of the SIM card ≥ Monthly traffic of the solar inverter + Monthly traffic of the power
meter + Monthly traffic of the EMI. If other devices are connected to the SmartLogger in the
network, the monthly traffic of the SIM card needs to be increased as required.
Table 4-1 SIM card traffic description
Monthly Traffic Requirement of the SIM Card
Traffic Baseline
Solar inverter
10 MB + 4 MB x Number of solar
inverters
Device performance data can
be updated every 5 minutes.
The solar inverter logs and I-V
curve diagnosis data can be
exported monthly. The solar
inverters can be upgraded
monthly.
Power meter
3 MB x Number of power meters
EMI
3 MB x Number of EMIs