User's Manual

Table Of Contents
SmartLogger3000
User Manual
5 System Operation
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
60
5 System Operation
5.1 Check Before Power-on
No.
Check That
1
The SmartLogger and SmartModule are installed correctly and securely.
2
All cables are connected securely.
3
Routing for the power cables and signal cables meets the requirements for
routing strong-current and weak-current cables and complies with the cable
routing plan.
4
Cables are bound neatly, and cable ties are secured evenly and properly in the
same direction.
5
There are no sundries such as unnecessary adhesive tape or cable ties on
cables.
5.2 Powering On the System
Step 1 Connect the power supply.
Method 1: When a power adapter is used, connect the power adapter cable and turn on
the switch on the AC socket side.
The rated input voltage of the power adapter is 100–240 V AC, and the rated input frequency is
50/60 Hz.
Select an AC socket that matches the power adapter.