User's Manual
Table Of Contents
- About This Document
- Contents
- 1 Safety Information
- 2 Product Overview
- 3 Device Installation
- 4 Cable Connections
- 4.1 Connecting Cables to the SmartLogger
- 4.1.1 Preparing Cables
- 4.1.2 Connecting a PE Cable
- 4.1.3 Connecting an RS485 Communications Cable
- 4.1.4 Connecting an MBUS Cable
- 4.1.5 Connecting a DI Signal Cable
- 4.1.6 Connecting the Output Power Cable
- 4.1.7 Connecting the AI Signal Cable
- 4.1.8 Connecting the DO Signal Cable
- 4.1.9 Connecting the Ethernet Cable
- 4.1.10 Connecting Fiber Jumpers
- 4.1.11 Installing a SIM Card and a 4G Antenna
- 4.1.12 Connecting the 24 V Input Power Cable
- 4.2 Connecting Cables to the SmartModule
- 4.2.1 Preparing Cables
- 4.2.2 Connecting the PE Cable
- 4.2.3 Connecting the Ethernet Cable
- 4.2.4 Connecting the 12 V Power Input Cable
- 4.2.5 Connecting the RS485 Communications Cable
- 4.2.6 Connecting the DI Signal Cable
- 4.2.7 Connecting the Output Power Cable
- 4.2.8 Connecting the AI Signal Cable
- 4.2.9 Connecting the PT Signal Cable
- 4.2.10 Connecting the 24 V Power Input Cable
- 4.1 Connecting Cables to the SmartLogger
- 5 System Operation
- 6 WebUI Operations
- 6.1 Introduction to WebUI
- 6.2 Device Commissioning
- 6.3 Parameter Settings
- 6.3.1 Setting User Parameters
- 6.3.2 Setting Parameters for Connecting to the Management System
- 6.3.3 Setting RS485 Communications Parameters
- 6.3.4 Setting Parameters for the Slave SmartLogger
- 6.3.5 Setting MBUS Parameters
- 6.3.6 Setting SUN2000 Parameters
- 6.3.7 Setting PID Module Parameters
- 6.3.8 Setting Power Meter Parameters
- 6.3.9 Setting EMI Parameters
- 6.3.10 Setting STS Parameters
- 6.3.11 Setting IEC103 Device Parameters
- 6.3.12 Setting Parameters for a Custom Device
- 6.3.13 Setting IEC104 Device Parameters
- 6.4 Power Grid Scheduling
- 7 Device Maintenance
- 8 FAQ
- 8.1 How Do I Connect the SmartLogger to the SUN2000 App or FusionSolar App?
- 8.2 How Do I Set FTP Parameters?
- 8.3 How Do I Set Email Parameters?
- 8.4 How Do I Change the SSID and Password of the Built-in WLAN?
- 8.5 How Do I Use DI Ports?
- 8.6 How Do I Use DO Ports?
- 8.7 How Do I Use the USB Port?
- 8.8 How Do I Change a Device Name?
- 8.9 How Do I Change the Communications Address?
- 8.10 How Do I Export Inverter Parameters?
- 8.11 How Do I Clear Alarms?
- 8.12 How Do I Enable the AI1 Port to Detect SPD Alarms?
- 8.13 Which Models of Power Meters and EMIs Are Supported by the SmartLogger?
- 8.14 How Do I Check the SIM Card Status?
- 9 Technical Specifications
- A Product User Lists
- B Domain Name List of Management Systems
- C Acronyms and Abbreviations
SmartLogger3000
User Manual
6 WebUI Operations
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
62
6 WebUI Operations
6.1 Introduction to WebUI
The web software version corresponding to the WebUI screenshots in this document is
SmartLogger V300R001C00SPC010. The screenshots are for reference only.
The parameter names, value ranges, and default values are subject to change. The actual
display prevails.
Delivering a reset, shutdown, or upgrade command to the solar inverters may cause power
grid connection failure, which affects the energy yield.
Only professionals are allowed to set the grid parameters, protection parameters, feature
parameters, and power adjustment parameters of the solar inverters. If the grid parameters,
protection parameters and feature parameters are incorrectly set, the solar inverters may
not connect to the power grid. If the power adjustment parameters are incorrectly set, the
solar inverters may not connect to the power grid as required. In these cases, the energy
yield will be affected.
Only professionals are allowed to set the power grid scheduling parameters of the
SmartLogger. Incorrect settings may cause the PV plant to fail to connect to the power grid
as required, which affects the energy yield.