User's Manual
Table Of Contents
- About This Document
- Contents
- 1 Safety Information
- 2 Product Overview
- 3 Device Installation
- 4 Cable Connections
- 4.1 Connecting Cables to the SmartLogger
- 4.1.1 Preparing Cables
- 4.1.2 Connecting a PE Cable
- 4.1.3 Connecting an RS485 Communications Cable
- 4.1.4 Connecting an MBUS Cable
- 4.1.5 Connecting a DI Signal Cable
- 4.1.6 Connecting the Output Power Cable
- 4.1.7 Connecting the AI Signal Cable
- 4.1.8 Connecting the DO Signal Cable
- 4.1.9 Connecting the Ethernet Cable
- 4.1.10 Connecting Fiber Jumpers
- 4.1.11 Installing a SIM Card and a 4G Antenna
- 4.1.12 Connecting the 24 V Input Power Cable
- 4.2 Connecting Cables to the SmartModule
- 4.2.1 Preparing Cables
- 4.2.2 Connecting the PE Cable
- 4.2.3 Connecting the Ethernet Cable
- 4.2.4 Connecting the 12 V Power Input Cable
- 4.2.5 Connecting the RS485 Communications Cable
- 4.2.6 Connecting the DI Signal Cable
- 4.2.7 Connecting the Output Power Cable
- 4.2.8 Connecting the AI Signal Cable
- 4.2.9 Connecting the PT Signal Cable
- 4.2.10 Connecting the 24 V Power Input Cable
- 4.1 Connecting Cables to the SmartLogger
- 5 System Operation
- 6 WebUI Operations
- 6.1 Introduction to WebUI
- 6.2 Device Commissioning
- 6.3 Parameter Settings
- 6.3.1 Setting User Parameters
- 6.3.2 Setting Parameters for Connecting to the Management System
- 6.3.3 Setting RS485 Communications Parameters
- 6.3.4 Setting Parameters for the Slave SmartLogger
- 6.3.5 Setting MBUS Parameters
- 6.3.6 Setting SUN2000 Parameters
- 6.3.7 Setting PID Module Parameters
- 6.3.8 Setting Power Meter Parameters
- 6.3.9 Setting EMI Parameters
- 6.3.10 Setting STS Parameters
- 6.3.11 Setting IEC103 Device Parameters
- 6.3.12 Setting Parameters for a Custom Device
- 6.3.13 Setting IEC104 Device Parameters
- 6.4 Power Grid Scheduling
- 7 Device Maintenance
- 8 FAQ
- 8.1 How Do I Connect the SmartLogger to the SUN2000 App or FusionSolar App?
- 8.2 How Do I Set FTP Parameters?
- 8.3 How Do I Set Email Parameters?
- 8.4 How Do I Change the SSID and Password of the Built-in WLAN?
- 8.5 How Do I Use DI Ports?
- 8.6 How Do I Use DO Ports?
- 8.7 How Do I Use the USB Port?
- 8.8 How Do I Change a Device Name?
- 8.9 How Do I Change the Communications Address?
- 8.10 How Do I Export Inverter Parameters?
- 8.11 How Do I Clear Alarms?
- 8.12 How Do I Enable the AI1 Port to Detect SPD Alarms?
- 8.13 Which Models of Power Meters and EMIs Are Supported by the SmartLogger?
- 8.14 How Do I Check the SIM Card Status?
- 9 Technical Specifications
- A Product User Lists
- B Domain Name List of Management Systems
- C Acronyms and Abbreviations
SmartLogger3000
User Manual
6 WebUI Operations
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
67
Main Menu
Second-Level
Menu
Third-Level
Menu
Function
Custom Device,
IEC103 Device,
and IEC104 Device
Running Info.
Queries the running information.
Teleindication
Queries teleindication parameters.
Telemetering
Queries telemetering parameters.
Telecontrol
Sets telecontrol parameters.
Teleadjust
Sets teleadjust parameters.
Query
Alarm History
N/A
Queries historical alarms.
Operation Log
N/A
Queries operation logs.
Export Data
N/A
Exports historical alarms, energy yield,
operation logs, and power grid scheduling
data.
Settings
User Param.
Date&Time
Sets the date and time.
Plant
Sets PV plant information.
Revenue
Sets the revenue parameters.
Save Period
Sets the save period of performance data.
Comm. Param.
Wireless Network
Sets parameters for the built-in WLAN.
Sets mobile data (4G/3G/2G)
parameters.
Wired Network
Sets wired network parameters.
RS485
Sets RS485 parameters.
Power Meter
Sets power meter parameters.
Management
System
Sets management system parameters.
Uploads a security certificate.
Modbus TCP
Sets Modbus TCP parameters.
IEC103
Sets IEC103 parameters.
IEC104
Sets IEC104 parameters.
FTP
Sets FTP parameters.
Email
Sets email parameters.
Power Adjustment
Active Power
Control
Sets parameters for active power control.
Reactive Power
Control
Sets parameters for reactive power control.