User's Manual
Table Of Contents
- About This Document
- Contents
- 1 Safety Information
- 2 Product Overview
- 3 Device Installation
- 4 Cable Connections
- 4.1 Connecting Cables to the SmartLogger
- 4.1.1 Preparing Cables
- 4.1.2 Connecting a PE Cable
- 4.1.3 Connecting an RS485 Communications Cable
- 4.1.4 Connecting an MBUS Cable
- 4.1.5 Connecting a DI Signal Cable
- 4.1.6 Connecting the Output Power Cable
- 4.1.7 Connecting the AI Signal Cable
- 4.1.8 Connecting the DO Signal Cable
- 4.1.9 Connecting the Ethernet Cable
- 4.1.10 Connecting Fiber Jumpers
- 4.1.11 Installing a SIM Card and a 4G Antenna
- 4.1.12 Connecting the 24 V Input Power Cable
- 4.2 Connecting Cables to the SmartModule
- 4.2.1 Preparing Cables
- 4.2.2 Connecting the PE Cable
- 4.2.3 Connecting the Ethernet Cable
- 4.2.4 Connecting the 12 V Power Input Cable
- 4.2.5 Connecting the RS485 Communications Cable
- 4.2.6 Connecting the DI Signal Cable
- 4.2.7 Connecting the Output Power Cable
- 4.2.8 Connecting the AI Signal Cable
- 4.2.9 Connecting the PT Signal Cable
- 4.2.10 Connecting the 24 V Power Input Cable
- 4.1 Connecting Cables to the SmartLogger
- 5 System Operation
- 6 WebUI Operations
- 6.1 Introduction to WebUI
- 6.2 Device Commissioning
- 6.3 Parameter Settings
- 6.3.1 Setting User Parameters
- 6.3.2 Setting Parameters for Connecting to the Management System
- 6.3.3 Setting RS485 Communications Parameters
- 6.3.4 Setting Parameters for the Slave SmartLogger
- 6.3.5 Setting MBUS Parameters
- 6.3.6 Setting SUN2000 Parameters
- 6.3.7 Setting PID Module Parameters
- 6.3.8 Setting Power Meter Parameters
- 6.3.9 Setting EMI Parameters
- 6.3.10 Setting STS Parameters
- 6.3.11 Setting IEC103 Device Parameters
- 6.3.12 Setting Parameters for a Custom Device
- 6.3.13 Setting IEC104 Device Parameters
- 6.4 Power Grid Scheduling
- 7 Device Maintenance
- 8 FAQ
- 8.1 How Do I Connect the SmartLogger to the SUN2000 App or FusionSolar App?
- 8.2 How Do I Set FTP Parameters?
- 8.3 How Do I Set Email Parameters?
- 8.4 How Do I Change the SSID and Password of the Built-in WLAN?
- 8.5 How Do I Use DI Ports?
- 8.6 How Do I Use DO Ports?
- 8.7 How Do I Use the USB Port?
- 8.8 How Do I Change a Device Name?
- 8.9 How Do I Change the Communications Address?
- 8.10 How Do I Export Inverter Parameters?
- 8.11 How Do I Clear Alarms?
- 8.12 How Do I Enable the AI1 Port to Detect SPD Alarms?
- 8.13 Which Models of Power Meters and EMIs Are Supported by the SmartLogger?
- 8.14 How Do I Check the SIM Card Status?
- 9 Technical Specifications
- A Product User Lists
- B Domain Name List of Management Systems
- C Acronyms and Abbreviations
SmartLogger3000
User Manual
6 WebUI Operations
Issue 04 (2020-03-11)
Copyright © Huawei Technologies Co., Ltd.
75
After the date and time are set, the date and time of all the inverters connected to the
SmartLogger are updated accordingly. Ensure that the settings are correct.
Changing the date and time affects the recording of system energy yield and performance
data. Do not change the time zone or system time unless necessary.
Plant
Parameter
Description
Plant name
Set this parameter as required.
NOTE
In the English half-width status, you cannot enter
any of the following characters:
<>:,`'?()#&\$|%+;~^"
Plant address
Plant owner
Plant owner address
Country/Region
Select a country/region based on the region
where the PV plant is located.
Revenue
Parameter
Description
Currency
Set this parameter as required.
The value can be EUR, GBP, USD, CNY,
or JPY.
Electricity price/kWh
Set this parameter to the local electricity
price, which is used to calculate the
converted revenue of the energy yield.
CO2 emission reduction coefficient
Set this parameter based on the local
standard.
Save Period
Parameter
Description
Performance data save period
Set this parameter to the save period of
performance data. After the setting, the data
will be displayed accordingly on the
performance data page.










