Installation & Assembly

43614
ASSEMBLY & INSTALLATION INSTRUCTIONS
Sprig Semi Flush 128715
A591
1. Carefully unpack the xture (A) from the carton.
2. Thread two studs (D) into the appropriate holes in the crossbar (B) that align with xture (A) and desired orientation.
3. Using two machine screws (not provided) attach crossbar (B) to the electric box using outer oval holes to orient
xture.
Note: A new electric box comes with screws. When replacing a fixture, retain the existing screws for use with the new
fixture.
4. Adjust the studs (D) to proper length to ensure the xture will t snugly against the ceiling.
5. Using suitable wire connectors (not provided) connect fixture wires to supply (white to white and black to black).
Attach a pigtail lead to the crossbar ground screw (C). Connect all ground wires (bare copper or green to bare copper
or green).
6. Carefully tuck all wires behind xture, push xture rmly against the ceiling and fasten by threading knobs (E) on to
studs (D).
Note: Be sure no wires are pinched between th ceiling and the fixture. Be sure threaded studs are fully seated in
knobs.
7. See instructions on next page for installing glass.
(Figure 1)
A
C
D
B
E
MACHINE
SCREWS
To Install Fixture (Figure 1)
CAUTION: FAILURE TO INSTALL THIS FIXTURE PROPERLY MAY RESULT IN SERIOUS PERSONAL INJURY OR DEATH AND
PROPERTY DAMAGE. We recommend installation by a licensed electrician. This product must be installed in accordance with
applicable installation code(s), by a person familiar with the construction and operation of the product and the hazards involved.*
Caution: Do not exceed maximum wattage noted on xture. Use only recommended bulbs with xture.
Please Note: After installation extra hardware and accessories are possible; our kits are used on multiple products.
CAUTION: BE SURE POWER IS OFF AT THE MAIN BREAKER BOX PRIOR TO INSTALLATION.
3 OF 4
CAUTION: MAKE SURE WIRE CONNECTORS ARE TWISTED ON SECURELY, AND NO BARE WIRE IS EXPOSED.