Product Brochure

CAN TAKE A SCORCHING.
AND A DRENCHING.
X
X
X
X
X
X
X
X
X
X
Reduces heat load on attic mounted A/C systems
Less heat transfer to the living space
Energy usage is reduced
Faster installation when compared to other radiant barrier systems using roofing felt
Eliminates the need for felt with a built-in vapor permeable water-resistive barrier
Durability reduces re-work and long term performance
Backed by a 30-year system warranty
**
Other
radiant barrier panels
ZIP System
®
radiant barrier panels
Vapor
Transmission
of
WRB Layer
12-16 perm
ASTM
E 96-00
Procedure B
Air
Barrier**
7/16", 1/2" & 5/8" ZIP System
®
roof sheathing
Performance
Category
1/2
5/8
Panel
Size
4' x 8'
4' x 8'
Panel
Count
70
55
PS2 Span
Rating
32/16
Structural 1
40/20
Structural 1
Code
Evaluation
Report
ESR 1473
ESR 1474
Vapor
Transmission
of
WRB Layer
Air
Barrier
***
7/16 4' x 8' 80
24/16
Structural 1
ASTM
E 2178 <0.02L(sm
2
)
@ 75 Pa
ASTM
E 2357
<0.2 L(sm
2
)
@ 75 Pa
ZIP System
®
radiant barrier roof panels are the fastest way to beat heat and moisture.
These easy-to-install, all-in-one structural panels feature a built-in water resistive layer
along with a new radiant barrier.
Reduces radiant heat transfer as much as 97%
Decreases attic temperatures up to 30°
Reduces home cooling costs up to 12%
*
ZIP UP A COOLER HOME.
A FASTER, STRONGER RADIANT BARRIER SOLUTION.
* The Florida Solar Energy Center/University of Central Florida Publication #FSEC EN-15-87 titled “Radiant Barriers: A Question & Answer Primer.” Studies represent cases in the
Southeast and may not be representative of other regions. Savings also depend on the amount of heat the roof and attic contribute to a homes cooling load.
** Limitations and restrictions apply. Visit ZIPsystem.com for details.
*** When used with ZIP System
flashing tape.
Although all projects are unique, experience has shown that 1 roll of 3 3/4" ZIP System
flashing tape is needed for approximately 7 sheets of 4' x 8' ZIP System
®
sheathing. This should
only be considered a general “rule of thumb” when ordering materials with the understanding that some jobs may require more or less depending on the specific project.
11