User's Manual

Table Of Contents
RT INSTALLATION
1027144–0001 Revision D
Commissioning the RT 7–1
RT installation
Chapter 7
Commissioning the RT
This chapter includes:
Prerequisites for commissioning – page 7–2
Connecting the IFL to the CCM – page 7–3
Front panel LCD operation – page 7–4
Pointing the antenna – page 7–8
Verifying HT acquisition – page 7–13
Entering an attenuator value – page 7–13
Checking the CCM, SSI, and ODU status – page 7–14
Verifying the RT’s operational state – page 7–17
RT to HT connection tests – page 7–18
Commissioning refers to final installation, adjustment, and
verification procedures necessary to ensure that the newly installed
RT is operational.
Observe these safety warnings while commissioning RTs:
DANGER
Do not work on a ladder or roof without
first reading the safety warnings on page x
of this manual. Failure to observe these
warnings could result in personal injury or
death.
WARNING
Potential radio frequency (RF) hazard:
Keep away from the front of the
outdoor unit (ODU) antenna while the
ODU is operating. Note that you cannot
tell from outward appearance whether
the ODU is operating or not.
Be careful with respect to the ODU you
are installing and ODUs that may
already be operating in the installation
area.
Failure to observe these warnings could
result in injury to eyes or other personal
injury.
Safety warnings