User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Indoor equipment
- Ch 4 - Installing IFL cables
- Ch. 5 - Installing mast mounts
- Ch 6 - Installing ODUs
- Ch 7 - Commissioning the RT
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating the IFL cable
- Index
1027144–0001 Revision D
Commissioning the RT 7–13
RT installation
Return to the IDU location to verify that the RT has acquired the
HT:
1. Observe the CCM LCD to verify that the RT has
successfully acquired the HT frequency.
The following display indicates that the RT has successfully
acquired the HT.
Install
Acq Ack: HT nnn
nnn = HT ID
Note: The LCD will display Acq Deny (acquisition
denied) if:
• The RT’s ESN has not been entered in the EMS
database, or
• The RT is pointed toward the wrong HT.
Specify the appropriate attenuator value, and then take the IDU
out of Install mode:
1. Scroll to the attenuator option:
Install
Mech Attn
2. Scroll to the attenuator selection display:
Mech Attn
20 dB
3. Scroll until the LCD shows the size of the installed
mechanical attenuator. If no attenuator is installed, select
0 dB. Press ENTER.
4. Take the IDU out of Install mode: Select Exit and press
ENTER.
Install
Exit
7.5
Verifying HT
acquisition
7.6
Entering an
attenuator value