User's Manual
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Installation summary
- Ch 2 - Prerequisites
- Ch 3 - Indoor equipment
- Ch 4 - Installing IFL cables
- Ch. 5 - Installing mast mounts
- Ch 6 - Installing ODUs
- Ch 7 - Commissioning the RT
- Ch 8 - Final steps
- Ch 9 - Troubleshooting
- Ch 10 - Maintenance
- App A - Acronyms
- App B - Standards compliance
- App C - Terminating the IFL cable
- Index
1027144–0001 Revision D
Commissioning the RT 7–15
RT installation
Check the status of the installed SSIs as follows:
(Note that SSIs are not required for commissioning. They can be
installed after RT commissioning.)
1. From the Status / CCM display, shown below,
Status
CCM
press the NEXT button to scroll to the SSI status menu:
Status
SSI 1
2. Use the NEXT or PREV button to scroll to the SSI you
want to check:
Status
SSI 2
Note: SSIs are numbered SSI 1 through SSI 4, according to
their positions in the IDU chassis:
Chassis slot SSI number
2 1
3 2
4 3
5 4
Slot 1 is occupied by the CCM.
3. Press ENTER to show the status of the selected SSI:
SSI 2
OK
The possible status conditions for SSIs are:
OK
Degraded
Failed
Unknown
(as explained on page 7–14)
Check the status of each installed SSI.
Check SSI status