User's Manual

10271450001 Revision D Index-5
R
Rack
See also hub rack
mounting, 6–8
options, 6–8
safety guidelines, 6–8
Redundancy bus cable, 6–33, 7–2
Related publications, vii
Remote terminal (RT) installation, vii
Removing the installation tools, 4–29
Repairs, 9–6
Replacing
antenna, 10–6
CCM, 10–11
faulty components, 9–6
IDU chassis, 10–9
IFL, 10–13
ODU, 10–3
SSIs, 10–12
transceiver, 10–4
RF arrestor, 5–9, 5–14
Roof types, 3–5
corrugated metal, 3–11
Router (for hub LAN), 1–2, 6–2, 6–6
configuration, 7–2
description, 6–41
S
Safety information, ix
rack mounting, 6–8
Sectors, definition and terminology, 4–9
Service loops, 5–7
Service–specific interface. See SSI
Site Data Record, 2–1
Site preparation, vii
Slots, IDU chassis
numbering of, 6–7
where CCM and SSIs are installed, 6–26,
6–28, 6–29, 6–40
Software downloading (CCM), 7–6
Spin–stripping tool (for IFL cable), C–3
SSIs, 7–2
adding, 10–2
DS3–TDM, 6–28
DS3–transparent, 6–29
function, 6–28
hot swapping, 10–2
installing, 6–30
chassis slots, 6–29, 10–2
LEDs, indications, explained, 6–31
moving, 10–2
numbering, 6–40
OC3c–ATM, 6–29
replacing, 10–12
status, 6–40
types, 6–28
Standards compliance, B–1
Startup diagnostics. See SUDS
State, 7–6
Status of CCM, SSIs, or ODU, 6–39
SUDS, 6–34, 6–36, 7–4
failure indication, 6–38
test and display sequence, 6–34, 6–36
SUDS Completed message, 7–4
Summary of installation, 1–3
Switch (for hub LAN), description, 6–41
T
Temperature, IDU chassis, 6–8
Terminating the IFL cable, C–1
Testing
DS1 test, 7–8
DS3 test, 7–10
fractional DS1 test, 7–12
fractional DS3 test, 7–14
HT to RT connections, 7–8
IFL cable and connectors, 5–15
Tools required for installation, 2–3
removing, 4–29
Torque
antenna bracket, 4–26
antenna mast clamp, 4–20
rack safety bolts, 6–4
temporary installation collar, 4–20
Torque wrench for antenna mount, 4–5
Transceiver
attaching to the antenna, 4–27
replacing, 10–4
Transmission equipment, 1–3