Installation Manual

10271450001 Revision D 7–6 Commissioning HTs Hub installation
When the CCM receives a boot reply message from the EMS boot
server, it begins to load its operational software.
3. Observe the Loading Software message on the LCD:
Loading Software
If the CCM is unable to load its software, the LCD returns
to the boot up sequence.
After loading its software, the CCM loads its configuration data.
After loading its configuration, the CCM becomes operational.
This is indicated by HT Disabled on the LCD.
4. Watch for HT Disabled on the LCD:
HT Freq 1A1
Disabled
(Frequency is
specific to HT)
This display signals that downloading has completed,
which demonstrates that the equipment is operational.
The HT is disabled, but operational, until SSIs are installed
and configured (through the EMS). When SSIs are installed
and configured, the HT is ready for service, and the
operational status is HT Enabled.
The possible operational states are:
Enabled HT is ready for service.
Disabled Equipment is operational, but HT
is not ready for service.
Degraded One or more components is not
fully operational.
Enabled
Degraded
HT is ready for service, but one
or more components is not fully
operational.
Enabled
In Test
All of the HT’s SSI are in test
mode.
Software loading
Configuration loading
Operational state