Installation Manual

10271450001 Revision DIndex-2
Connections
checking, 6–36, 8–3
weatherproofing, 8–2
Corrugated metal roof, 3–11
Crimp tool, C–7
Customer equipment, connecting, 8–3
Customer sign–off, 8–3
D
Devices, CCM, 7–5
Diagnostic mode, 6–34
Diameter of ODU mast, 4–5
Dismantling an HT, 10–15
Documents, related, vii
Drawings
hub network schematic, 2–1
hub reference drawing, 1–2
hub rooftop drawing, 2–1
DS1 test, 7–8
DS1 test (fractional DS1), 7–12
DS3 test, 7–10
DS3 test (fractional DS3), 7–14
DS3–TDM SSI, 6–28
DS3–transparent SSI, 6–29
E
Element Management System. See EMS
Elevation
adjusting, 4–23
explained and illustrated, 4–23
Emissions, B–2, B–3
EMS, 2–7, 7–2
database, 7–2
Equipment from other vendors, vii
Ethernet switch (for hub LAN), description, 6–41
Existing structures as ODU mounts, 3–13
Exit (LCD), 6–35
F
FAILED message, 7–4
Failure indication on CCM LCD, 6–38
FCC, B–2, B–3
Fractional DS1 test, 7–12
Fractional DS3 test, 7–14
Front panel display. See LCD
G
Grounding
lightning arrestor, 5–12
ODU, 4–30
power supply
ac, 6–14
dc, 6–16, 6–17
dual ac or dc, 6–12
rack, 6–6
H
Handling materials, 3–4
Heat–shrink tubing (for IFL cable) , C–3, C–11
HT
defined, 1–2
dismantling, 10–15
HT alignment direction, 4–6
HT Disabled message, 7–3, 7–6
HT Enabled message, 7–3, 7–6
HT to RT connections tests, 7–8
Hub LAN router, description, 6–41
Hub LAN switch, description, 6–41
Hub rack, 6–2
grounding, 6–6
installing, 6–2
concrete floor, 6–3
wood floor, 6–4
lifting, 6–3
location, 6–2
Hub terminal. See HT