Installation Manual

10271450001 Revision DIndex-4
M
MAC address, 7–2
Magnetic declination, 4–6
Main Menu (CCM LCD), 6–34
Maintenance, 10–1
Maps
local, requirements, 2–5, 4–5
magnetic declination, 4–6
plotting HT alignment directions, 4–6
true north, 4–6
Mast, diameter, 4–5
Mast mount, 3–2
location, 3–3
standard type, 3–6
assembly instructions, 3–6
types, 3–5
using existing structures, 3–13
Materials, handling, 3–4
Menu map for CCM LCD, 6–35
Moisture contamination, 8–2
Mounts. See Mast mount and Antenna mount
Moving SSIs, 10–2
Multiple IFL cables, 5–16
N
N connectors
attaching to IFL cable, C–6
location (IFL cable), 5–3
National Electric Code (NEC), B–2
O
OC3c–ATM SSI, 6–29
ODU, 4–1
connecting the IFL cable, 5–15
grounding, 4–30
illustration, 4–3
location, 2–1
replacing, 10–3
standards compliance, B–2
status, 7–7
transporting to the roof, 4–5
ODU installer tool kit, 2–4
illustration, 2–6
removing tools, 4–29
tools included, 4–10
uses, 4–10
ODU location, 3–3
Operational state, 7–6
possible states, 7–6
Outdoor unit. See ODU
P
Penetrating the roof, 5–5
Penetration sleeve, 5–6
Personnel
number of installers, vii
qualifications, installers, vii
Power input requirement
ac power supply, 6–13
dc power supply, 6–16
Power supply (IDU), 6–8, 6–11
ac, 6–13
connecting power, 6–15
grounding, 6–14
power input requirement, 6–13
dc, 6–16
connecting power, 6–18
grounding, 6–16, 6–17
power input requirement, 6–16
powering off, 6–22
dual ac or dc, 6–11
See also Power supply (IDU), dc
grounding, 6–12
Power–on test
CCM, 6–36
IDU chassis, 6–25
Prerequisites
commissioning, 2–7, 7–2
installation, 2–1
Publications, related, vii
Q
Qualifications for installers, vii