Installation Manual

10271450001 Revision D Installing ODUs 4–19Hub installation
6. Rotate the antenna approximately 45° toward the HT
alignment direction (sector), to the upright position, as
shown in figure 4-14—then finger tighten the antenna
bracket locking nuts so the antenna is snug and without
excess movement.
The antenna is now “captured” by the antenna mount.
However, because the antenna bracket nuts are not fully
tightened, you can adjust the antenna elevation.
Figure 4-14 Rotating the antenna to the
upright installation position
T0006004
Antenna
45