Installation Manual

1027144–0001 Draft – Revision D.01
Installing ODUs 6–9
RT installation
3. Align the collar with respect to the target HT as shown in
figure 6-7.
4. Using a torque wrench with a deep socket, tighten the
temporary installation collar locking nuts to 16
foot–pounds torque (21.7 Newton–meters).
Figure 6-7 Aligning the temporary installation collar
Installer position
to align collar.
(Sight from here.)
2 locking nuts:
16 foot-pounds
(21.7 Newton-meters)
rt025
Collar
Mast
Point these arms
from the HT sector.
away
Align this flat surface
with line of sight to HT.
HT
Close-up - Flat surface on collar
CAUTION
Correct torque is
essential
for successful
installation and adjustment. Tighten nuts to
the exact torque stated. Incorrect torque
may result in damage to equipment.
Important
: Due to planned enhancements
to the antenna mount design, the specified
torque settings are subject to change.
Verify the torque settings with the HNS
Wireless Networks Division (WND)
Technical Assistance Center (TAC) before
installing the antenna and mount.
Important: The temporary collar, clamp, and adjusters are not
removed until the RT is commissioned and verified as operational.
Commissioning the RT is discussed in chapter 7.