Installation Instructions

Table Of Contents
10262090001 Revision BIndex-2
checking operation, 3–6
compliance information, B–3
components, 1–3, 1–6
part numbers, C–1
configuring
cards, 2–25
gateway access, 5–7
description, 1–1, 1–6
dimensions, A–1
front panel illustration, 1–5
installing, 3–2
mounting options, 1–3
operating mode, 6–16
operating system, 1–2
PBX connections, 8–2
power indicator, 3–6
power requirements, 3–6
rack mounting, 3–4
setup mode, 6–10
slots
card assigned to each slot, 2–9
identification, 2–8
numbering, 2–8
types, 2–8
troubleshooting, 13–1
unpacking, 2–2
verifying configuration, 4–2
specifications, A–1
electrical, A–2
environmental, A–3
weight, A–1
Cover, Controller chassis, 2–11, 2–24
D
Databases, backing up and restoring, D–2
Deleting a Quad T1 card, 14–9
Description (AIReach OS), 1–1
DIP switch settings, Controller cards, 2–13
Documentation set for the AIReach OS, xii
E
Electrical specifications
Controller, A–2
picocells, A–5
Electrostatic discharge precautions, 2–12
Enabling alarm paging, 8–11
Environmental specifications
Controller, A–3
picocells, A–5
External modem, 8–11
F
Fasteners for picocell mounting plate, 7–3
FCC compliance, B–1
Field test mode (for mobile phones), 6–22
Flow chart, installation tasks, 1–8
Frequency, 4–10
assignment, 4–8
band scan
24–hour, 7–7, 7–18
initial (6–minute scan), 6–10
G
Gateway
access, configuring, 5–7
IP address, 5–2, 5–7
pinging, 5–8
H
H.100 bus, 2–13
cable, 2–23, 14–2
Hardware Details window, 2–26
Hazard warnings, xv
HLR
configuring, 4–21
repointing, 8–8
HLR Configuration window, 4–21
I
I/O address. See Jumper settings and DIP switch
settings
Icon, AROS Configuration, 2–28
Inspection, quality, 10–1
Installation QA Inspection Checklist, 10–1
Interference, B–1
IP addresses, 5–3
Controller, 4–1
gateway, 5–2, 5–7
LAN card, 8–10
picocells, 13–2
IRQ (interrupt). See Jumper settings and DIP
switch settings