Installation Instructions
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Introduction
- Ch 2 - Adding cards to the Controller
- Unpacking the System Controller
- Unpacking the picocells
- System Controller card configuration
- Adding cards to the System Controller (first steps)
- Jumper and DIP switch settings
- Attaching bus cables
- Adding cards to the System Controller (final steps)
- Configuring Controller cards
- Verifying the card configuration
- Ch 3 - Installing the Controller
- Ch 4 - Verifying the Controller configuration
- Ch 5 - Configuring the router
- Ch 6 - Testing picocells
- Ch 7 - Installing picocells
- Ch 8 - Connecting to external equipment
- Ch 9 - System testing
- Ch 10 - Installation inspection
- Ch 11 - Provisioning
- Ch 12 - Remote Client
- Ch 13 - Troubleshooting
- Ch 14 - Maintaining Quad T1 cards
- App A - Specifications
- App B - Standards compliance information
- App C - Part numbers
- App D - Updates and backups
- Index
1026209–0001 Revision BIndex-2
checking operation, 3–6
compliance information, B–3
components, 1–3, 1–6
part numbers, C–1
configuring
cards, 2–25
gateway access, 5–7
description, 1–1, 1–6
dimensions, A–1
front panel illustration, 1–5
installing, 3–2
mounting options, 1–3
operating mode, 6–16
operating system, 1–2
PBX connections, 8–2
power indicator, 3–6
power requirements, 3–6
rack mounting, 3–4
setup mode, 6–10
slots
card assigned to each slot, 2–9
identification, 2–8
numbering, 2–8
types, 2–8
troubleshooting, 13–1
unpacking, 2–2
verifying configuration, 4–2
specifications, A–1
electrical, A–2
environmental, A–3
weight, A–1
Cover, Controller chassis, 2–11, 2–24
D
Databases, backing up and restoring, D–2
Deleting a Quad T1 card, 14–9
Description (AIReach OS), 1–1
DIP switch settings, Controller cards, 2–13
Documentation set for the AIReach OS, xii
E
Electrical specifications
Controller, A–2
picocells, A–5
Electrostatic discharge precautions, 2–12
Enabling alarm paging, 8–11
Environmental specifications
Controller, A–3
picocells, A–5
External modem, 8–11
F
Fasteners for picocell mounting plate, 7–3
FCC compliance, B–1
Field test mode (for mobile phones), 6–22
Flow chart, installation tasks, 1–8
Frequency, 4–10
assignment, 4–8
band scan
24–hour, 7–7, 7–18
initial (6–minute scan), 6–10
G
Gateway
access, configuring, 5–7
IP address, 5–2, 5–7
pinging, 5–8
H
H.100 bus, 2–13
cable, 2–23, 14–2
Hardware Details window, 2–26
Hazard warnings, xv
HLR
configuring, 4–21
repointing, 8–8
HLR Configuration window, 4–21
I
I/O address. See Jumper settings and DIP switch
settings
Icon, AROS Configuration, 2–28
Inspection, quality, 10–1
Installation QA Inspection Checklist, 10–1
Interference, B–1
IP addresses, 5–3
Controller, 4–1
gateway, 5–2, 5–7
LAN card, 8–10
picocells, 13–2
IRQ (interrupt). See Jumper settings and DIP
switch settings