Installation Instructions

Table Of Contents
10262090001 Revision B 1–8 Introduction
The following flow chart (Figure 1-5 on page 1–9) shows the
sequence of major tasks required for site preparation, installation,
and commissioning of the AIReach OS.
Test picocells at the System Controller site. Complete picocell
cabling before you install the System Controller and test picocells.
1.4
Procedural flow
chart