Installation Instructions

Table Of Contents
10262090001 Revision B
Introduction 1–9
Figure 1-5 Flow chart: AIReach OS major installation and test tasks
Ship Damaged
Equipment to Material
Return Center (MRC)
Reschedule
Installation
See next page
Start
Provide Installation Package
to Implementation Team
Verify Contents of
Installation Package
Obtain Missing
Items
Ship AIReach OS
Equipment to
Implementation Team
Verify Contents
of Shipment(s)
Missing
Items
Ship Replacement or
Missing Equipment to
Implementation Team
MRC Ships Damaged
Equipment to
AIReach OS Vendor
Deploy to Site
with Equipment
Conduct Pre-Installation
Walk-Through with
Customer
Discrepancies
Site
Ready
Additional
Cards
Install Additional
Circuit Cards
Install Controller
Enter / Verify
Controller
Configuration
Test Controller
Performance
Install and
Configure Router
Configure Controller
for Gateway Access
Temporarily Connect
Scanning Picocell
to Controller
Initiate 6 Minute
Test Frequency
Band Scan
Temporarily Connect
Each Picocell
to Controller
Ye s
No
Ye s
No
Ye s
No
Ye s
No
Ship Failed Controller
Component to MRC
Receive Replacement
Controller Component
from MRC
Install Replacement
Component into
Controller
Failures
Ye s
No
A
B
2/17/00
T0001030