Installation Instructions
Table Of Contents
- Title page
- Contents
- About this manual
- Safety information
- Ch 1 - Introduction
- Ch 2 - Adding cards to the Controller
- Unpacking the System Controller
- Unpacking the picocells
- System Controller card configuration
- Adding cards to the System Controller (first steps)
- Jumper and DIP switch settings
- Attaching bus cables
- Adding cards to the System Controller (final steps)
- Configuring Controller cards
- Verifying the card configuration
- Ch 3 - Installing the Controller
- Ch 4 - Verifying the Controller configuration
- Ch 5 - Configuring the router
- Ch 6 - Testing picocells
- Ch 7 - Installing picocells
- Ch 8 - Connecting to external equipment
- Ch 9 - System testing
- Ch 10 - Installation inspection
- Ch 11 - Provisioning
- Ch 12 - Remote Client
- Ch 13 - Troubleshooting
- Ch 14 - Maintaining Quad T1 cards
- App A - Specifications
- App B - Standards compliance information
- App C - Part numbers
- App D - Updates and backups
- Index
1026209–0001 Revision B
Installing the Controller 3–1
Chapter 3
Installing the Controller
This chapter includes the following topics:
• Rack–mount configuration – page 3–2
• Mounting the Controller chassis – page 3–4
• Controller cabling – page 3–5
• Checking System Controller operation – page 3–6
• System cabling – page 3–7
The AIReach OS System Controller, monitor, and associated
components are typically installed in a rack. All cards must be
installed in the System Controller before the Controller is installed
in the rack.
To install cards in the Controller, see Chapter 2.
For verification information and procedures, see Chapter 4.