03.
1. Adjust splitter bars for desired chute width as follows: a. Loosen two wing nuts, one on each end of splitter. b. Lock the hopper in the "open" position by using the Safety Lock beside the hand lever. (Not necessary on Model H-4291.) c. Flip the adjustable chute bars back and forth to form alternate right and left chutes of desired width. A chute width of two to three times materials topsize is recommended.
that normally hold material pan, fitting holes over threaded studs. Replace wing nuts. With bag-tightening lever in horizontal position (right or left), draw top of bag over sharp corners of chute bottom and reverse fold bag on top of bag-tightening lock tab. Lift lever to secure bag. 7. Models H-4290, and H-4291 are manufactured with 60° chute slopes as required for coal or coke (ASTM D2013, D346) or for other materials requiring a steep slope for proper sample flow.
Warranty Humboldt Mfg. Co. warrants its products to be free from defects in material or workmanship. The exclusive remedy for this warranty is Humboldt Mfg. Co., factory replacement of any part or parts of such product, for the warranty of this product please refer to Humboldt Mfg. Co. catalog on Terms and Conditions of Sale. The purchaser is responsible for the transportation charges. Humboldt Mfg. Co.