ECO I N S T A L L A T I O N M A N U A L
! B E F O R E YOU BEGIN SAFETY & PRECAUTIONS 2-3 FAN PLACEMENT 4 MAINTENANCE 5 IN THE BOX 6 TOOLS NEEDED 7 I N S TA LL ATION 188 CONTENTS LEGACY The Hunter legacy is not only about quality—it’s about longevity. We invented the ceiling fan. We build fans that last, fans that are designed as fans.
! B E F OR E Y O U B E G I N SAFETY & PRECAUTIONS READ THE ENTIRE MANUAL BEFORE OPERATING THE FAN Read and understand this manual before installing or operating a fan unit. Installation, adjustment, repair, or maintenance must be performed by qualified personnel. Follow all safety practices and instructions during the installation, operation, and servicing of the fan. Failure to apply these safety practices could result in death or serious injury.
! B E F OR E Y O U B E G I N SAFETY & PRECAUTIONS KEY RETENTION SYSTEM COMPONENTS Our fans are engineered with safety features that prevent pieces of the fan from falling in the unlikely event of a catastrophic failure. Install the retention cable on EVERY fan. The retention cable, if installed per Hunter Industrial Fan specifications, will provide comprehensive protection of people, equipment, and property in the unlikely event of mounting system failure.
! B E F OR E Y O U B E G I N FAN PLACEMENT SPRINKLER SYSTEMS AND FAN PLACEMENT ROOF PITCH In any installation where fire sprinklers are in place, the fan should not interfere with their correct operation. Fans should be located no less than 3 feet below a sprinkler, and placed central to each sprinkler quadrant. Our industrial control panel can be connected to a fire relay system, which, in an emergency, will stop fans in case of fire.
! B E F OR E Y O U B E G I N MAINTENANCE GUY WIRE CHECK Checking a fan’s guy wires for tension and inspecting for frayed sections could prevent a problem before it occurs. Fan owners should confirm that the guy wires are not wrapped around any sharp edges. We recommend attaching guy wires to the building with provided clamps to prevent fraying. Turnbuckles should be checked to ensure tightness. If they are loose, the guy wire cables need to be re-tensioned.
! IN THE BOX B E F OR E Y O U B E G I N FAN COMPONENTS a) MOUNTING HARDWARE KIT b) c) d) c) a) a) (2) Shims b) (2) Clamps c) (4) Bolts, Nuts & Washers b) GUY WIRE KIT a) (1) Gripple Kit b) (4) Beam Clamps c) (4) Turnbuckles e) a) b) c) a) (1) Downrod b) (1) Motor & (4) Motor Nuts c) (1) Standard Control d) (1) Control Panel e) (4) Blades COMMUNICATON KIT a) b) a) (1) 100ft Cat5 Cable (Terminated) b) (2) RJ45 Connectors 6
! B E F OR E Y O U B E G I N Metric Ratcheting Wrench Set Torque Wrench Metric (Deep & Short) Socket and Ratchet Set Wire Rope Cutters Standard (Deep & Short) Socket and Ratchet Set Phillips and Flat Head Screwdrivers Metric Allen Wrench Set #10 to #14 AWG Strippers Metric Allen Socket Set Multimeter Tape Measure Cat5 Termination Tools (optional) Magnetic Level 7 TOOLS NEEDED
I N S TA L L AT I O N A Secure bracket and downrod to lift and raise to I-beam. 1 MOUNTING BOLTS A WASHERS B CLAMPS Assemble the mount with shims and clamps on bracket. Hook the clamp on one side of the I-beam and tighten hardware until the mount is snug but can still be moved. B C SHIMS C Assemble the opposing shim and clamp on to the I-beam and hand tighten. D Center the mount under the I-beam. Ensure the clamps have maximum engagement on both sides and tighten hardware.
I N S TA L L AT I O N A Wrap retention cable around beam or building structure. 2 RETENTION SYSTEM A B B Secure remaining cable to itself with cable clamps. Coil excess cable and secure. Secure first clamp on the loose end of the cable. 9 Secure the second clamp to the cable approximately 6” from the first clamp. Secure the remaining clamp in the center of the two installed clamps.
I N S TA L L AT I O N A Insert retension link into fork and align holes. 3 MOTOR ASSEMBLY A Insert clevis pin into retention rod and secure with provided clip. B Align the connector from the motor with the downrod connector. B NOTE Be sure not to pinch the motor cable when raising the downrod into place. Twist the collar on the connector to complete the connection. Be sure to twist until the connection locks. C Lift motor up to downrod while pushing cables into downrod.
4 CONTROL PANEL I N S TA L L AT I O N WARNING! Before completing the mechanical installation, ensure breaker is off and all Lockout/Tagout procedures are in place. The electrical receptacle for the panel should be installed prior to panel installation. For a chart of receptacles, refer to page 21. If the retention cable is not installed, the warranty will be voided. A Position panel with plug connectors facing down. Mount control panel with 1/4-20 fasteners, one in each corner of the panel.
I N S TA L L AT I O N A Remove cover to access mounting holes. 5 STANDARD CONTROL A B B Mount contol box using mount holes in back of the box. C Once the control box has been mounted reattach cover. C D D Plug in RJ45 cable from control panel to side of control box.
I N S TA L L AT I O N A Attach beam clamps to structure. Clip guywire end to beam clamp. 6 GUY WIRES B A B Feed wire through gripple into closed turnbuckle end and back through gripple. C Hook turnbuckle to guy wire disc. Feed guy wires through disc to hold in place during turnbuckle installation. D E ATTACH GUY WIRE TO BUILDING STRUCTURE WHILE MAINTAINING A 45-DEGREE ANGLE BETWEEN THE CEILING AND THE GUY WIRE. DO NOT WRAP GUY WIRES AROUND THE BUILDING STRUCTURE.
I N S TA L L AT I O N 7 BLADES A To install blade, insert the press studs through the holes in the blade holder. B A Remember to install with the numbers facing up. B Start the nylon lock nuts onto the press studs to hold in place. C Tighten the nylon locknuts on the the press studs using the 19mm wrench or socket. D Repeat steps A-C for each of the three remaining blades. C NOTE The blade is marked with a number to signify which size fan it goes with.
RE F E R E N C E 15 ELECTRICAL
RE F E R E N C E FIRE PANEL (FIELD WIRING) NOTE Jumper is set to “NORMALLY UNENERGIZED” setting from factory 16
RE F E R E N C E FAN WILL NOT START TROUBLESHOOTING Check to see if all plugs are securely connected. Verify the touchscreen has power. Confirm supply power is adequate and functional. 17 TOUCHSCREEN IS BLANK Verify UI has power. FAULT SCREEN ON UI? For fault codes, please call our Technical Department at (844) 593-FANS (3267).
2434 ATRIUM WAY NASHVILLE, TN 37214 1-844-591-FANS (3267) TECHNICAL DEPARTMENT: 1-844-591-FANS (3267) HUNTERINDUSTRIALFAN.COM ©2016 Hunter Fan Company. All rights reserved. | REV A.