Instructions / Assembly
9
Assembly Instrucons
Only one Center Wire Deck (J) will be used 
for a 72” ceiling rack installaon. 
Two Center Wire Decks (J) will be used 
for a 96” ceiling rack installaon.
I
I
72” Assembly View
J
96” Assembly View
J
J
Step 10 - Install Wire Decking (I & J)
Place the End Wire Decks (I) on the ends of the beams with the notched corners facing the end corners of the posts. 
The notched corners should provide clearance for the posts. Place one Center Wire Deck (J) between the previously 
installed end wire decks for a 72” ceiling rack, or install two for an 96” ceiling rack. There will be one center wire deck 
le over if installing on a 72” wide ceiling rack. 
Step 9 - Install Cross Supports (H)
Assemble the six Cross Supports (H) by placing the rivets located on both ends of the cross support into the triangular holes 
located on the top ledge of both beam assemblies. 
Note: Be sure the notched 
ends on the End Wire Deck (I) 
are installed facing the posts.
H
H
✓
I










