Note: Install into solid wood joists only. Brackets must be mounted perfectly in line and square to each other.
Make sure the lag bolts are ght against the joist but DO NOT over-ghten the lag bolts. If they are over-
ghtened, the bolt could snap or the hole may be stripped.
Step 2 - Install Ceiling Brackets (A)
Locate and mark the center of ceiling joist with a pencil.
Use a stud nder to locate the joists if ceiling is nished
with drywall. Use Ceiling Angle Bracket as a template to
mark the two end holes of the Ceiling Angle Bracket on
the center line of the joist using a pencil. Drill pilot holes
using a 7/32” drill bit to the marked locaons.
Depending on the ceiling rack size and orientaon
determined, measure 48, 72 or 96” from the installed
ceiling angle bracket to determine the locaon of the
second ceiling angle bracket along the same joist.
Must be measured from the same end of the bracket.
Repeat the steps to install the second ceiling angle
bracket in the same orientaon as the rst.
Install Ceiling Angle Bracket (A) into marked joist us-
ing two Lag Bolts (K) and two Large Washers (O) with a
9/16” socket wrench. The Lag Bolts should be installed
into the two end holes of the Ceiling Angle Brackets.
X
X
A
A
48”, 72” or 96”
For the second set of brackets, depending on desired
size and orientaon, measure 48”, 72” or 96” from
edge of installed ceiling angle bracket to the other
locaon for the next bracket on the other joist. The
bracket should be installed in the same orientaon and
must measure 48”, 72” or 96” from same edge of each
bracket. Repeat the steps to install the second set of
ceiling angle brackets in the same orientaon.
72”
96”
48”
Note: If spacing in joists do not match up to the desired
assembled size and direcon you will need to install an
addional joists to accommodate, see page 3 for opons.
Must measure 48”, 72” or 96” from same end of
each bracket.
Must measure 48”, 72” or 96” from same edge of
each bracket.