Instructions / Assembly
9
Assembly Instrucons
Step 10 - Install Wire Decking (I & J)
Only one Center Wire Deck (J) will be used
for a 72” ceiling rack installaon.
Step 9 - Install Cross Supports (H)
Assemble the six Cross Supports (H) by placing the rivets located on both ends of the cross support into the triangular holes
located on the top ledge of the both beam assemblies.
Two Center Wire Decks (J) will be used
for a 96” ceiling rack installaon.
Note: Be sure the notched
ends on the End Wire Deck (I)
are installed facing the posts.
96” Assembly View
72” Assembly View
I
I
J
J
J
H
H
✓
I
Place the End Wire Decks (I) on the ends of the beams with the notched corners facing the end corners of the posts.
The notched corners should provide clearance for the posts. Place one Center Wire Deck (J) between the previously
installed end wire decks for a 72” ceiling rack, or install two for an 96” ceiling rack. There will be one center wire deck
le over if installing on a 72” wide ceiling rack.