Instructions / Assembly
Table Of Contents
Assembly
6
Drill attachment holes
1
The 72 in. Hutch is designed to specically t only on the Husky Professional Duty 72 in. 20-Drawer Workbench ,
which includes the following products:
72 in. 20-Dr. Professional Duty Workbench Model # HPRO72MWC20BLK SKU # 1006636633 / 1006581370
27.5 in. Professional Duty Side Locker Model # HPRO27SLOCKERBL SKU # 1006636654 / 1006581373
63.5 in. Professional Duty Top Locker Model # HPRO63TLOCKERBL SKU # 1006636637 / 1006581369
72 in. Professional Duty Top Locker Model # HPRO72TLOCKERBL SKU # 1006636636 / 1006581287
Align and x the
Drill template (AA) on the back left corner of the stainless steel top of the Husky Professional
72in Workbench, ush with the left edge. Figure 1:1.
□
CAUTION:
Use caution when drilling the attachment holes through the steel top.
Figure 1:1
Figure 1:2
B
B
A
C
C
D
A
Figure 1:3
1
2
3
4
5
6
7
8
Figure 1:4 Figure 1:5 Figure 1:6
Use a marker to mark hole locations A, B, C. Figure 1:2.
Align the Template (AA) on the back right corner, ush with the right edge and mark hole locations B, C, D. Figure 1:3.
Flip the Template (AA) over and align with the front right corner, ush with the right edge and mark hole location A.
Figure 1:4.
Align the Template (AA) on the front left corner, and mark only hole location D. Figure 1:5.
There should be a total of 8 marked hole locations on the steel work top. Ensure correct, per Figure 1:6.
Use a hammer and punch to create a small divot in the steel top at each of the marked locations for the
drill bit to align.
□
□
□
□
□
□
□
Using a power drill and the Stop drill bit (JJ), carefully drill the 8 connection holes. Ensure holes are drilled clean
and perpendicular to the surface to properly expose the press nuts beneath.
D
Power Drill










