Operator's Manual

Table Of Contents
2. Adjust the handle position to one of the holes
(C).
A
B
C
3. Put the bolt (B) through the hole (C).
4. Attach the knob (A) to the bolt and tighten the
knob.
5. Attach more carriage bolts (B) and handle knobs
(A) to attach the upper handle to the lower
handle.
To install the discharge chute
1. Put the deflector assembly for the discharge
chute on the top of the discharge chute. The
discharge opening must point to the front of the
product.
2. Put the rotator head (A) on the discharge chute
bracket (J).
3. Align the pins below the rotator head with the
holes in the discharge chute bracket.
4. Put the rotator head on the pin (E), and the
threaded stud (G) on the bracket (F).
A
B
E
F
D
C
G
J
I
H
5. Attach a locknut (B) on the threaded stud and
tighten.
6. Attach the square retainer (I) with a locknut (H).
7. Put the cables through the hook cable slot (C).
To install the discharge chute lever
and the release cable
1. Push the knob (D) down on the discharge chute
lever. Use a rubber mallet if it is necessary.
2. Attach the release cable to the discharge chute
lever at connection (A).
C
E
F
A
B
D
3. Make sure that the release cable is attached
correctly to the discharge chute.
4. Put the release cable in the groove (B) on the
discharge chute lever.
876 - 014 - 19.05.2021
11